- It has meant that the support for the posts is now likely to be different, and that means that he needs to work from level concrete pads.
- In turn that means he has to build the level concrete pads, which means creating some shallow formers (shuttering).
- The design chosen for the formers required cutting some holes in OSB, and that meant using GF's jigsaw.
- But GF has lent the jigsaw to Sir Lancinglot, so GF went out and bought a new one.
Well, you know what it's like when you go to buy power tools (faint Simian grunts can just be heard in the background). GF ended up with a JCB! He should probably explain that this is not a large wheeled contraption with a backhoe and grab, but rather the make of jigsaw chosen. Just for good measure he also picked up a 1000W SDS drill, which should enable him to penetrate further into the existing concrete before laying the pads.
[File under: Deck]
No comments:
Post a Comment