Search This Blog

Saturday, March 05, 2016

Done

The man from Amazon arrived. the Gorse Fox checked out his stocks and realised that some addition 300mm cable ties would be useful, so whizzed round to B&Q. Within 10 minutes he was back home and up i the loft.

The power cable was tucked away and secured with cable ties and the extension sockets dropped to the right location. The shelf support was fitted and the shelf dropped on top. All was secured.

Finally, the Netgear switch was positioned and powered up. All he has to do now, is wait for the cable guys.

Most satisfactory

No comments: