The electrician started work today. We had already determined how many sockets and lights we would need - we just had to agree where they would be sited. We also had a long chat discussing whether to use cool or warm lights and whether they should be dimmable, standard, or LED. Decisions made, he set about creating an extension to the existing ring (having checked the current load and resistance, first).
A lot of drilling, and seemingly miles of cable later the first part of the first fix was complete. He will return next week to do the lighting. Meanwhile, we also had a visit from the aerial chap and he has ensured we have a suitable TV aerial with a good signal in the Orangery.
Lots of progress. Very satisfying.
No comments:
Post a Comment