Search This Blog

Friday, February 05, 2016

Engineering - well, Construction

As explained yesterday, today was to be fun-filled. The IKEA unit needed to be constructed and the drawers and boxes needed to be put together.

Actually, it all went without a hitch. The Kallax shelving unit went together without any fuss. In fact the biggest problem was fixing it to the wall. This was to prevent it from toppling, but the width of skirting boards was such that the Gorse Fox had to find a suitable spacer to allow the fixings to be tightened without pulling the unit backwards off the ground. Once that was all done, there were several boxes to be assembled, and some drawers to assemble and fix.

All done, and now the Silver Vixen is busy sorting out her fabrics and cottons and filling the unit.

No comments: